Application
TechCrete Concrete Admix may be added to the concrete either at the batching plant or added to the mixer at the job site. It is preferable that TechCrete Concrete Admix is added to the dry mix to ensure even distribution prior to the addition of water. If TechCrete Concrete Admix is added after the addition of water, mixing must continue for an additional 10 minutes prior to placement of the mix. If there are questions contact the technical department at 800-610-2895. Do not apply if the ambient temperatures are below +4°C (+39°F) or above +35°C (+95°F).